Richland County, Wisconsin · 0.24 MI N. JCT Cth I · Structure no. B52025400000000

Built
2005
20 years old
Condition
Good
inspected April 2024
Type
Slab
Concrete
Length
32 ft
1 main span
Daily traffic
1,100
2022 count
Owner
State
State Highway Agency

About this bridge

Sth 58 over Mcglynn CR is a concrete slab carrying Sth 58 over Mcglynn CR in Richland County, Wisconsin. It was built in 2005, so it is 20 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,100 vehicles a day, roughly 4% of them trucks, projected to reach 1,200 by 2043. The structure is 32 ft (9.9 m) long and 38 ft wide. If it were closed, the detour would be 12.4 mi (20 km).

CarriesSth 58
CrossesMcglynn CR
Location0.24 MI N. JCT Cth I
RouteState Highway 58
Coordinates43.51246, -90.20678
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.8 US tons
Inventory rating48.2 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length32 ft (9.9 m)
Longest span30 ft (9.1 m)
Deck width38 ft (11.6 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,100 (2022)
Projected traffic1,200 by 2043
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed12.4 mi (20 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sth 58 over Mcglynn CR built?

It was built in 2005, making it 20 years old in 2025.

What condition is Sth 58 over Mcglynn CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Sth 58 over Mcglynn CR carry?

About 1,100 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is Sth 58 over Mcglynn CR?

The structure is 32 ft (9.9 m) long with a longest span of 30 ft (9.1 m) and a deck 38 ft wide.

Who owns Sth 58 over Mcglynn CR?

It is owned by the State Highway Agency.