US Bridges

Sth 60 over Pine River

Good

Richland County, Wisconsin · 0.1M E JCT Cth Tb · Structure no. B52017900000000

Built
1998
27 years old
Condition
Good
inspected April 2022
Type
Slab
Concrete Continuous
Length
225 ft
4 main spans
Daily traffic
1,500
2022 count
Owner
State
State Highway Agency

About this bridge

Sth 60 over Pine River is a concrete continuous slab carrying Sth 60 over Pine River in Richland County, Wisconsin. It was built in 1998, so it is 27 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,500 vehicles a day, roughly 10% of them trucks, projected to reach 1,800 by 2042. The structure is 225 ft (68.6 m) long and 39 ft wide. If it were closed, the detour would be 12.4 mi (20 km).

CarriesSth 60
CrossesPine River
Location0.1M E JCT Cth Tb
RouteState Highway 60
Coordinates43.22241, -90.30337
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating71.7 US tons
Inventory rating42.9 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length225 ft (68.6 m)
Longest span66 ft (20 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2022)
Projected traffic1,800 by 2042
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed12.4 mi (20 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sth 60 over Pine River built?

It was built in 1998, making it 27 years old in 2025.

What condition is Sth 60 over Pine River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2022.

How much traffic does Sth 60 over Pine River carry?

About 1,500 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is Sth 60 over Pine River?

The structure is 225 ft (68.6 m) long with a longest span of 66 ft (20 m) and a deck 39 ft wide.

Who owns Sth 60 over Pine River?

It is owned by the State Highway Agency.