Lrd W 6th ST over Lrd Horlick DR Root Riv
GoodRacine County, Wisconsin · 0.8M W JCT Sth 20 · Structure no. B51015500000000
- Built
- 2022
- 3 years old
- Condition
- Good
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 175 ft
- 1 main span
- Daily traffic
- 8,600
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Lrd W 6th ST over Lrd Horlick DR Root Riv is a prestressed concrete stringer/multi-beam or girder carrying Lrd W 6th ST over Lrd Horlick DR Root Riv in Racine County, Wisconsin. It was built in 2022, so it is 3 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,600 vehicles a day, roughly 5% of them trucks, projected to reach 9,500 by 2043. The structure is 175 ft (53.3 m) long and 47 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd W 6th ST over Lrd Horlick DR Root Riv built?
It was built in 2022, making it 3 years old in 2025.
What condition is Lrd W 6th ST over Lrd Horlick DR Root Riv in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does Lrd W 6th ST over Lrd Horlick DR Root Riv carry?
About 8,600 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is Lrd W 6th ST over Lrd Horlick DR Root Riv?
The structure is 175 ft (53.3 m) long with a longest span of 122 ft (37.2 m) and a deck 47 ft wide.
Who owns Lrd W 6th ST over Lrd Horlick DR Root Riv?
It is owned by the City or Municipal Highway Agency.