US Bridges

Sth 182 over North Fork Flambeau Rive

Good

Price County, Wisconsin · 0.3M E JCT Sth 13 · Structure no. B50008200000000

Built
2017
8 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
282 ft
3 main spans
Daily traffic
3,800
2023 count
Owner
State
State Highway Agency

About this bridge

Sth 182 over North Fork Flambeau Rive is a prestressed concrete stringer/multi-beam or girder carrying Sth 182 over North Fork Flambeau Rive in Price County, Wisconsin. It was built in 2017, so it is 8 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,800 vehicles a day, roughly 6% of them trucks, projected to reach 6,600 by 2043. The structure is 282 ft (86 m) long and 47 ft wide. If it were closed, the detour would be 61.5 mi (99 km).

CarriesSth 182
CrossesNorth Fork Flambeau Rive
Location0.3M E JCT Sth 13
RouteState Highway 182
Coordinates45.93413, -90.44651
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating74.6 US tons
Inventory rating57.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length282 ft (86 m)
Longest span93 ft (28.4 m)
Deck width47 ft (14.2 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,800 (2023)
Projected traffic6,600 by 2043
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed61.5 mi (99 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sth 182 over North Fork Flambeau Rive built?

It was built in 2017, making it 8 years old in 2025.

What condition is Sth 182 over North Fork Flambeau Rive in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Sth 182 over North Fork Flambeau Rive carry?

About 3,800 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is Sth 182 over North Fork Flambeau Rive?

The structure is 282 ft (86 m) long with a longest span of 93 ft (28.4 m) and a deck 47 ft wide.

Who owns Sth 182 over North Fork Flambeau Rive?

It is owned by the State Highway Agency.