US Bridges

Lrd Merryland Driv over Tomorrow River

Good

Portage County, Wisconsin · 1.6 Miles East of Sth 66 · Structure no. B49018500000000

Built
2017
8 years old
Condition
Good
inspected September 2023
Type
Culvert
Concrete
Length
27 ft
2 main spans
Daily traffic
215
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Merryland Driv over Tomorrow River is a concrete culvert carrying Lrd Merryland Driv over Tomorrow River in Portage County, Wisconsin. It was built in 2017, so it is 8 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 215 vehicles a day, projected to reach 260 by 2042. The structure is 27 ft (8.2 m) long. If it were closed, the detour would be 3.7 mi (6 km).

CarriesLrd Merryland Driv
CrossesTomorrow River
Location1.6 Miles East of Sth 66
RouteCity Street 0
Coordinates44.59256, -89.36288
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length27 ft (8.2 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic215 (2023)
Projected traffic260 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Merryland Driv over Tomorrow River built?

It was built in 2017, making it 8 years old in 2025.

What condition is Lrd Merryland Driv over Tomorrow River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Lrd Merryland Driv over Tomorrow River carry?

About 215 vehicles per day (2023 count).

How long is Lrd Merryland Driv over Tomorrow River?

The structure is 27 ft (8.2 m) long with a longest span of 12 ft (3.7 m).

Who owns Lrd Merryland Driv over Tomorrow River?

It is owned by the Town or Township Highway Agency.