Sth 29-STH 35 over Greenwood Valley Creek
GoodPosted for loadPierce County, Wisconsin · 1.9M E JCT Cth Mm · Structure no. B47002100000000
- Built
- 1956
- 69 years old, rebuilt 1977
- Condition
- Good
- inspected April 2024
- Type
- Slab
- Concrete Continuous
- Length
- 67 ft
- 2 main spans
- Daily traffic
- 3,600
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Sth 29-STH 35 over Greenwood Valley Creek is a concrete continuous slab carrying Sth 29-STH 35 over Greenwood Valley Creek in Pierce County, Wisconsin. It was built in 1956 and reconstructed in 1977, so it is 69 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for other load-capacity restriction.
It carries about 3,600 vehicles a day, roughly 7% of them trucks, projected to reach 4,200 by 2041. The structure is 67 ft (20.3 m) long and 43 ft wide. If it were closed, the detour would be 41.6 mi (67 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 29-STH 35 over Greenwood Valley Creek built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1977.
What condition is Sth 29-STH 35 over Greenwood Valley Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Sth 29-STH 35 over Greenwood Valley Creek carry?
About 3,600 vehicles per day (2021 count), of which roughly 7% are trucks.
How long is Sth 29-STH 35 over Greenwood Valley Creek?
The structure is 67 ft (20.3 m) long with a longest span of 32 ft (9.9 m) and a deck 43 ft wide.
Who owns Sth 29-STH 35 over Greenwood Valley Creek?
It is owned by the State Highway Agency.