US Bridges

Cth P over Eau Galle River

Fair

Pepin County, Wisconsin · 0.1M W JCT Cth O · Structure no. B46000500000000

Built
1979
46 years old
Condition
Fair
inspected April 2024
Type
Slab
Concrete Continuous
Length
89 ft
2 main spans
Daily traffic
897
2022 count
Owner
County
County Highway Agency

About this bridge

Cth P over Eau Galle River is a concrete continuous slab carrying Cth P over Eau Galle River in Pepin County, Wisconsin. It was built in 1979, so it is 46 years old, older than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 897 vehicles a day, projected to reach 986 by 2043. The structure is 89 ft (27.1 m) long and 32 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesCth P
CrossesEau Galle River
Location0.1M W JCT Cth O
RouteCounty Highway 0P
Coordinates44.62328, -92.00896
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.8 US tons
Inventory rating32.2 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadH 20
Structure length89 ft (27.1 m)
Longest span44 ft (13.3 m)
Deck width32 ft (9.8 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic897 (2022)
Projected traffic986 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cth P over Eau Galle River built?

It was built in 1979, making it 46 years old in 2025.

What condition is Cth P over Eau Galle River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Cth P over Eau Galle River carry?

About 897 vehicles per day (2022 count).

How long is Cth P over Eau Galle River?

The structure is 89 ft (27.1 m) long with a longest span of 44 ft (13.3 m) and a deck 32 ft wide.

Who owns Cth P over Eau Galle River?

It is owned by the County Highway Agency.