US Bridges

Lrd Freistadt Road over Pigeon Creek

Fair

Ozaukee County, Wisconsin · 0.6 M E of JCT Sth 181 · Structure no. B45000700000000

Built
1999
26 years old
Condition
Fair
inspected September 2024
Type
Slab
Concrete Continuous
Length
35 ft
1 main span
Daily traffic
3,200
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lrd Freistadt Road over Pigeon Creek is a concrete continuous slab carrying Lrd Freistadt Road over Pigeon Creek in Ozaukee County, Wisconsin. It was built in 1999, so it is 26 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,200 vehicles a day, projected to reach 3,333 by 2043. The structure is 35 ft (10.8 m) long and 32 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLrd Freistadt Road
CrossesPigeon Creek
Location0.6 M E of JCT Sth 181
RouteCity Street 0
Coordinates43.23617, -87.99196
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating66.6 US tons
Inventory rating39.2 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length35 ft (10.8 m)
Longest span34 ft (10.3 m)
Deck width32 ft (9.8 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,200 (2022)
Projected traffic3,333 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Freistadt Road over Pigeon Creek built?

It was built in 1999, making it 26 years old in 2025.

What condition is Lrd Freistadt Road over Pigeon Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does Lrd Freistadt Road over Pigeon Creek carry?

About 3,200 vehicles per day (2022 count).

How long is Lrd Freistadt Road over Pigeon Creek?

The structure is 35 ft (10.8 m) long with a longest span of 34 ft (10.3 m) and a deck 32 ft wide.

Who owns Lrd Freistadt Road over Pigeon Creek?

It is owned by the City or Municipal Highway Agency.