US Bridges

Lrd New RD over Br Plum Creek

Good

Outagamie County, Wisconsin · 1.1M E JCT Cth Gg · Structure no. B44048600000000

Built
2023
2 years old
Condition
Good
inspected August 2023
Type
Slab
Concrete
Length
38 ft
1 main span
Daily traffic
49
2023 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd New RD over Br Plum Creek is a concrete slab carrying Lrd New RD over Br Plum Creek in Outagamie County, Wisconsin. It was built in 2023, so it is 2 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 49 vehicles a day, roughly 10% of them trucks, projected to reach 54 by 2043. The structure is 38 ft (11.7 m) long and 27 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesLrd New RD
CrossesBr Plum Creek
Location1.1M E JCT Cth Gg
RouteCity Street 0
Coordinates44.29927, -88.19173
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating54.2 US tons
Inventory rating41.8 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length38 ft (11.7 m)
Longest span36 ft (11 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic49 (2023)
Projected traffic54 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd New RD over Br Plum Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is Lrd New RD over Br Plum Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Lrd New RD over Br Plum Creek carry?

About 49 vehicles per day (2023 count), of which roughly 10% are trucks.

How long is Lrd New RD over Br Plum Creek?

The structure is 38 ft (11.7 m) long with a longest span of 36 ft (11 m) and a deck 27 ft wide.

Who owns Lrd New RD over Br Plum Creek?

It is owned by the Town or Township Highway Agency.