US Bridges

Lrd Rubyred Drive over Apple Creek Northeast

Good

Outagamie County, Wisconsin · Rubyred DR · Structure no. B44048100000000

Built
2020
5 years old
Condition
Good
inspected July 2024
Type
Slab
Concrete
Length
21 ft
1 main span
Daily traffic
300
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lrd Rubyred Drive over Apple Creek Northeast is a concrete slab carrying Lrd Rubyred Drive over Apple Creek Northeast in Outagamie County, Wisconsin. It was built in 2020, so it is 5 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 300 vehicles a day, projected to reach 300 by 2043. The structure is 21 ft (6.5 m) long and 65 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesLrd Rubyred Drive
CrossesApple Creek Northeast
LocationRubyred DR
RouteCity Street 0
Coordinates44.3211, -88.34917
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating48.6 US tons
Inventory rating37.5 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length21 ft (6.5 m)
Longest span21 ft (6.4 m)
Deck width65 ft (19.8 m)
Roadway width41 ft (12.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic300 (2021)
Projected traffic300 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Rubyred Drive over Apple Creek Northeast built?

It was built in 2020, making it 5 years old in 2025.

What condition is Lrd Rubyred Drive over Apple Creek Northeast in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Lrd Rubyred Drive over Apple Creek Northeast carry?

About 300 vehicles per day (2021 count).

How long is Lrd Rubyred Drive over Apple Creek Northeast?

The structure is 21 ft (6.5 m) long with a longest span of 21 ft (6.4 m) and a deck 65 ft wide.

Who owns Lrd Rubyred Drive over Apple Creek Northeast?

It is owned by the City or Municipal Highway Agency.