US Bridges

Cth E (ballard Rd) over IH 41

Fair

Outagamie County, Wisconsin · 0.8M N JCT Cth Oo · Structure no. B44017200000000

Built
1995
30 years old
Condition
Fair
inspected July 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
209 ft
2 main spans
Daily traffic
25,900
2021 count
Owner
State
State Highway Agency

About this bridge

Cth E (ballard Rd) over IH 41 is a prestressed concrete continuous stringer/multi-beam or girder carrying Cth E (ballard Rd) over IH 41 in Outagamie County, Wisconsin. It was built in 1995, so it is 30 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 25,900 vehicles a day, projected to reach 31,800 by 2042. The structure is 209 ft (63.6 m) long and 104 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesCth E (ballard Rd)
CrossesIH 41
Location0.8M N JCT Cth Oo
RouteCounty Highway 0E
Coordinates44.29784, -88.37481
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73.9 US tons
Inventory rating41.1 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length209 ft (63.6 m)
Longest span105 ft (32 m)
Deck width104 ft (31.6 m)
Roadway width79 ft (24.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,900 (2021)
Projected traffic31,800 by 2042
Trucks0%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Cth E (ballard Rd) over IH 41 built?

It was built in 1995, making it 30 years old in 2025.

What condition is Cth E (ballard Rd) over IH 41 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does Cth E (ballard Rd) over IH 41 carry?

About 25,900 vehicles per day (2021 count).

How long is Cth E (ballard Rd) over IH 41?

The structure is 209 ft (63.6 m) long with a longest span of 105 ft (32 m) and a deck 104 ft wide.

Who owns Cth E (ballard Rd) over IH 41?

It is owned by the State Highway Agency.