US Bridges

IH 41 SB over Lrd Spencer ST

Fair

Outagamie County, Wisconsin · 0.5M S JCT Sth 125 to E · Structure no. B44016300000000

Built
1992
33 years old
Condition
Fair
inspected July 2023
Type
Slab
Concrete Continuous
Length
113 ft
3 main spans
Daily traffic
38,550
2021 count
Owner
State
State Highway Agency

About this bridge

IH 41 SB over Lrd Spencer ST is a concrete continuous slab carrying IH 41 SB over Lrd Spencer ST in Outagamie County, Wisconsin. It was built in 1992, so it is 33 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 38,550 vehicles a day, roughly 16% of them trucks, projected to reach 68,000 by 2042. The structure is 113 ft (34.4 m) long and 81 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesIH 41 SB
CrossesLrd Spencer ST
Location0.5M S JCT Sth 125 to E
RouteInterstate 41
Coordinates44.25878, -88.46666
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating90.4 US tons
Inventory rating53.6 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length113 ft (34.4 m)
Longest span55 ft (16.8 m)
Deck width81 ft (24.7 m)
Roadway width78 ft (23.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic38,550 (2021)
Projected traffic68,000 by 2042
Trucks16%
Lanes on structure4
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was IH 41 SB over Lrd Spencer ST built?

It was built in 1992, making it 33 years old in 2025.

What condition is IH 41 SB over Lrd Spencer ST in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.

How much traffic does IH 41 SB over Lrd Spencer ST carry?

About 38,550 vehicles per day (2021 count), of which roughly 16% are trucks.

How long is IH 41 SB over Lrd Spencer ST?

The structure is 113 ft (34.4 m) long with a longest span of 55 ft (16.8 m) and a deck 81 ft wide.

Who owns IH 41 SB over Lrd Spencer ST?

It is owned by the State Highway Agency.