Sth 32-MAIN ST over Oconto River
GoodOconto County, Wisconsin · 2.8M N JCT Cth Z · Structure no. B42006400000000
- Built
- 1999
- 26 years old
- Condition
- Good
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 164 ft
- 2 main spans
- Daily traffic
- 2,300
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Sth 32-MAIN ST over Oconto River is a prestressed concrete continuous stringer/multi-beam or girder carrying Sth 32-MAIN ST over Oconto River in Oconto County, Wisconsin. It was built in 1999, so it is 26 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 2,300 vehicles a day, roughly 7% of them trucks, projected to reach 3,810 by 2042. The structure is 164 ft (49.9 m) long and 51 ft wide. If it were closed, the detour would be 92.6 mi (149 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 32-MAIN ST over Oconto River built?
It was built in 1999, making it 26 years old in 2025.
What condition is Sth 32-MAIN ST over Oconto River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does Sth 32-MAIN ST over Oconto River carry?
About 2,300 vehicles per day (2021 count), of which roughly 7% are trucks.
How long is Sth 32-MAIN ST over Oconto River?
The structure is 164 ft (49.9 m) long with a longest span of 80 ft (24.3 m) and a deck 51 ft wide.
Who owns Sth 32-MAIN ST over Oconto River?
It is owned by the State Highway Agency.