US Bridges

Mil Reservation RD over Ranch Creek Tributary

Good

Monroe County, Wisconsin · Mil Grid 833894 · Structure no. DAPFORCOY000081

Built
2006
19 years old
Condition
Good
inspected September 2024
Type
Slab
Concrete
Length
40 ft
1 main span
Daily traffic
200
2018 count
Owner
Federal
Army

About this bridge

Mil Reservation RD over Ranch Creek Tributary is a concrete slab carrying Mil Reservation RD over Ranch Creek Tributary in Monroe County, Wisconsin. It was built in 2006, so it is 19 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 30% of them trucks, projected to reach 200 by 2046. The structure is 40 ft (12.3 m) long and 26 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesMil Reservation RD
CrossesRanch Creek Tributary
LocationMil Grid 833894
Coordinates44.13577, -90.70759
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating97.9 US tons
Inventory rating75.4 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length40 ft (12.3 m)
Longest span38 ft (11.6 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2018)
Projected traffic200 by 2046
Trucks30%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerArmy
Maintained byArmy
Historic statusHistorical significance not determinable at this time
Work proposedDeck rehabilitation with only incidental widening
Estimated improvement cost$2,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Mil Reservation RD over Ranch Creek Tributary built?

It was built in 2006, making it 19 years old in 2025.

What condition is Mil Reservation RD over Ranch Creek Tributary in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Mil Reservation RD over Ranch Creek Tributary carry?

About 200 vehicles per day (2018 count), of which roughly 30% are trucks.

How long is Mil Reservation RD over Ranch Creek Tributary?

The structure is 40 ft (12.3 m) long with a longest span of 38 ft (11.6 m) and a deck 26 ft wide.

Who owns Mil Reservation RD over Ranch Creek Tributary?

It is owned by the Army.