US Bridges

Lrd Emerson RD over Mud Creek

Good

Monroe County, Wisconsin · 0.2M S JCT Sth 21 · Structure no. B41032400000000

Built
2021
4 years old
Condition
Good
inspected June 2023
Type
Slab
Concrete
Length
36 ft
1 main span
Daily traffic
1,500
2021 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Emerson RD over Mud Creek is a concrete slab carrying Lrd Emerson RD over Mud Creek in Monroe County, Wisconsin. It was built in 2021, so it is 4 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,500 vehicles a day, projected to reach 1,660 by 2039. The structure is 36 ft (11.1 m) long and 31 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesLrd Emerson RD
CrossesMud Creek
Location0.2M S JCT Sth 21
RouteCity Street 0
Coordinates44.01508, -90.51513
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.9 US tons
Inventory rating49.3 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length36 ft (11.1 m)
Longest span34 ft (10.4 m)
Deck width31 ft (9.3 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2021)
Projected traffic1,660 by 2039
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Emerson RD over Mud Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is Lrd Emerson RD over Mud Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Lrd Emerson RD over Mud Creek carry?

About 1,500 vehicles per day (2021 count).

How long is Lrd Emerson RD over Mud Creek?

The structure is 36 ft (11.1 m) long with a longest span of 34 ft (10.4 m) and a deck 31 ft wide.

Who owns Lrd Emerson RD over Mud Creek?

It is owned by the Town or Township Highway Agency.