Lrd Canary Ave over Spencer Creek
GoodMonroe County, Wisconsin · 1.0M W JCT Sth 27 · Structure no. B41018800000000
- Built
- 1990
- 35 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 68 ft
- 1 main span
- Daily traffic
- 288
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd Canary Ave over Spencer Creek is a prestressed concrete stringer/multi-beam or girder carrying Lrd Canary Ave over Spencer Creek in Monroe County, Wisconsin. It was built in 1990, so it is 35 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 288 vehicles a day, roughly 12% of them trucks, projected to reach 316 by 2043. The structure is 68 ft (20.7 m) long and 28 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Canary Ave over Spencer Creek built?
It was built in 1990, making it 35 years old in 2025.
What condition is Lrd Canary Ave over Spencer Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does Lrd Canary Ave over Spencer Creek carry?
About 288 vehicles per day (2022 count), of which roughly 12% are trucks.
How long is Lrd Canary Ave over Spencer Creek?
The structure is 68 ft (20.7 m) long with a longest span of 66 ft (20.1 m) and a deck 28 ft wide.
Who owns Lrd Canary Ave over Spencer Creek?
It is owned by the Town or Township Highway Agency.