Sth 131 over IH 90
FairMonroe County, Wisconsin · 4.2M N JCT Cth a · Structure no. B41011700000000
- Built
- 1968
- 57 years old, rebuilt 2001
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 232 ft
- 2 main spans
- Daily traffic
- 4,800
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
Sth 131 over IH 90 is a steel continuous stringer/multi-beam or girder carrying Sth 131 over IH 90 in Monroe County, Wisconsin. It was built in 1968 and reconstructed in 2001, so it is 57 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,800 vehicles a day, roughly 6% of them trucks, projected to reach 5,760 by 2041. The structure is 232 ft (70.8 m) long and 68 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 131 over IH 90 built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 2001.
What condition is Sth 131 over IH 90 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Sth 131 over IH 90 carry?
About 4,800 vehicles per day (2021 count), of which roughly 6% are trucks.
How long is Sth 131 over IH 90?
The structure is 232 ft (70.8 m) long with a longest span of 116 ft (35.5 m) and a deck 68 ft wide.
Who owns Sth 131 over IH 90?
It is owned by the State Highway Agency.