IH 94 EB over Lrd Foley Avenue
FairMonroe County, Wisconsin · 1.2M E JCT Ush 12 to E · Structure no. B41002800000000
- Built
- 1963
- 62 years old, rebuilt 1986
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 211 ft
- 4 main spans
- Daily traffic
- 13,050
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
IH 94 EB over Lrd Foley Avenue is a steel continuous stringer/multi-beam or girder carrying IH 94 EB over Lrd Foley Avenue in Monroe County, Wisconsin. It was built in 1963 and reconstructed in 1986, so it is 62 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 13,050 vehicles a day, roughly 15% of them trucks, projected to reach 15,660 by 2041. The structure is 211 ft (64.3 m) long and 43 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 94 EB over Lrd Foley Avenue built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1986.
What condition is IH 94 EB over Lrd Foley Avenue in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does IH 94 EB over Lrd Foley Avenue carry?
About 13,050 vehicles per day (2021 count), of which roughly 15% are trucks.
How long is IH 94 EB over Lrd Foley Avenue?
The structure is 211 ft (64.3 m) long with a longest span of 57 ft (17.4 m) and a deck 43 ft wide.
Who owns IH 94 EB over Lrd Foley Avenue?
It is owned by the State Highway Agency.