IH Ramp IH 43 Nb/I over Lrd Canal St/Cprr/Menomo
GoodMilwaukee County, Wisconsin · 0.5 MI N JCT Sth 59 · Structure no. B40112100000000
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected July 2021
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 884 ft
- 5 main spans
- Daily traffic
- 11,100
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
IH Ramp IH 43 Nb/I over Lrd Canal St/Cprr/Menomo is a steel continuous stringer/multi-beam or girder carrying IH Ramp IH 43 Nb/I over Lrd Canal St/Cprr/Menomo in Milwaukee County, Wisconsin. It was built in 2011, so it is 14 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 11,100 vehicles a day, roughly 7% of them trucks, projected to reach 13,320 by 2042. The structure is 884 ft (269.3 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH Ramp IH 43 Nb/I over Lrd Canal St/Cprr/Menomo built?
It was built in 2011, making it 14 years old in 2025.
What condition is IH Ramp IH 43 Nb/I over Lrd Canal St/Cprr/Menomo in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2021.
How much traffic does IH Ramp IH 43 Nb/I over Lrd Canal St/Cprr/Menomo carry?
About 11,100 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is IH Ramp IH 43 Nb/I over Lrd Canal St/Cprr/Menomo?
The structure is 884 ft (269.3 m) long with a longest span of 205 ft (62.5 m) and a deck 31 ft wide.
Who owns IH Ramp IH 43 Nb/I over Lrd Canal St/Cprr/Menomo?
It is owned by the State Highway Agency.