Sth 241 N/27th ST over Root River
FairMilwaukee County, Wisconsin · 0.1M N JCT IH 94 to W · Structure no. B40095400000000
- Built
- 1931
- 94 years old, rebuilt 1982
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 118 ft
- 2 main spans
- Daily traffic
- 6,800
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Sth 241 N/27th ST over Root River is a prestressed concrete stringer/multi-beam or girder carrying Sth 241 N/27th ST over Root River in Milwaukee County, Wisconsin. It was built in 1931 and reconstructed in 1982, so it is 94 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,800 vehicles a day, roughly 3% of them trucks, projected to reach 8,160 by 2042. The structure is 118 ft (36.1 m) long and 113 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 241 N/27th ST over Root River built?
It was built in 1931, making it 94 years old in 2025. It was reconstructed in 1982.
What condition is Sth 241 N/27th ST over Root River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Sth 241 N/27th ST over Root River carry?
About 6,800 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is Sth 241 N/27th ST over Root River?
The structure is 118 ft (36.1 m) long with a longest span of 55 ft (16.8 m) and a deck 113 ft wide.
Who owns Sth 241 N/27th ST over Root River?
It is owned by the State Highway Agency.