IH41/94 NB & SB over IH Ramp SW IH41/94 NB to
FairMilwaukee County, Wisconsin · Mitchell Interchange · Structure no. B40082100000000
- Built
- 2012
- 13 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 74 ft
- 1 main span
- Daily traffic
- 138,000
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
IH41/94 NB & SB over IH Ramp SW IH41/94 NB to is a prestressed concrete stringer/multi-beam or girder carrying IH41/94 NB & SB over IH Ramp SW IH41/94 NB to in Milwaukee County, Wisconsin. It was built in 2012, so it is 13 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 138,000 vehicles a day, projected to reach 165,600 by 2041. The structure is 74 ft (22.6 m) long and 655 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH41/94 NB & SB over IH Ramp SW IH41/94 NB to built?
It was built in 2012, making it 13 years old in 2025.
What condition is IH41/94 NB & SB over IH Ramp SW IH41/94 NB to in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does IH41/94 NB & SB over IH Ramp SW IH41/94 NB to carry?
About 138,000 vehicles per day (2021 count).
How long is IH41/94 NB & SB over IH Ramp SW IH41/94 NB to?
The structure is 74 ft (22.6 m) long with a longest span of 55 ft (16.8 m) and a deck 655 ft wide.
Who owns IH41/94 NB & SB over IH Ramp SW IH41/94 NB to?
It is owned by the State Highway Agency.