US Bridges

Lrd S 76th ST over IH 94

Good

Milwaukee County, Wisconsin · 0.5 MI S JCT Ush 18 · Structure no. B40078500000000

Built
2014
11 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
216 ft
2 main spans
Daily traffic
9,800
2022 count
Owner
State
State Highway Agency

About this bridge

Lrd S 76th ST over IH 94 is a prestressed concrete stringer/multi-beam or girder carrying Lrd S 76th ST over IH 94 in Milwaukee County, Wisconsin. It was built in 2014, so it is 11 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,800 vehicles a day, projected to reach 12,600 by 2043. The structure is 216 ft (65.8 m) long and 96 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesLrd S 76th ST
CrossesIH 94
Location0.5 MI S JCT Ush 18
RouteCity Street 0
Coordinates43.02797, -88.00711
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55 US tons
Inventory rating38.3 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length216 ft (65.8 m)
Longest span106 ft (32.3 m)
Deck width96 ft (29.3 m)
Roadway width72 ft (21.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,800 (2022)
Projected traffic12,600 by 2043
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Lrd S 76th ST over IH 94 built?

It was built in 2014, making it 11 years old in 2025.

What condition is Lrd S 76th ST over IH 94 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Lrd S 76th ST over IH 94 carry?

About 9,800 vehicles per day (2022 count).

How long is Lrd S 76th ST over IH 94?

The structure is 216 ft (65.8 m) long with a longest span of 106 ft (32.3 m) and a deck 96 ft wide.

Who owns Lrd S 76th ST over IH 94?

It is owned by the State Highway Agency.