US Bridges

Off Ramp - Airport over Howell Terminal Road

Good

Milwaukee County, Wisconsin · At Terminal Road · Structure no. B40066800000000

Built
2001
24 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
51 ft
1 main span
Daily traffic
500
2022 count
Owner
County
County Highway Agency

About this bridge

Off Ramp - Airport over Howell Terminal Road is a prestressed concrete stringer/multi-beam or girder carrying Off Ramp - Airport over Howell Terminal Road in Milwaukee County, Wisconsin. It was built in 2001, so it is 24 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 500 vehicles a day, projected to reach 500 by 2043. The structure is 51 ft (15.5 m) long and 27 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesOff Ramp - Airport
CrossesHowell Terminal Road
LocationAt Terminal Road
Coordinates42.94725, -87.90838
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54 US tons
Inventory rating32.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length51 ft (15.5 m)
Longest span49 ft (14.9 m)
Deck width27 ft (8.2 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic500 (2022)
Projected traffic500 by 2043
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Off Ramp - Airport over Howell Terminal Road built?

It was built in 2001, making it 24 years old in 2025.

What condition is Off Ramp - Airport over Howell Terminal Road in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Off Ramp - Airport over Howell Terminal Road carry?

About 500 vehicles per day (2022 count).

How long is Off Ramp - Airport over Howell Terminal Road?

The structure is 51 ft (15.5 m) long with a longest span of 49 ft (14.9 m) and a deck 27 ft wide.

Who owns Off Ramp - Airport over Howell Terminal Road?

It is owned by the County Highway Agency.