Sth 181-N 76th ST over Lrd W Douglas Ave
FairMilwaukee County, Wisconsin · 0.9M N JCT Sth 145 to N · Structure no. B40037800000000
- Built
- 1968
- 57 years old, rebuilt 1992
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 327 ft
- 6 main spans
- Daily traffic
- 29,400
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Sth 181-N 76th ST over Lrd W Douglas Ave is a steel continuous stringer/multi-beam or girder carrying Sth 181-N 76th ST over Lrd W Douglas Ave in Milwaukee County, Wisconsin. It was built in 1968 and reconstructed in 1992, so it is 57 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 29,400 vehicles a day, roughly 3% of them trucks, projected to reach 39,310 by 2043. The structure is 327 ft (99.8 m) long and 86 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 181-N 76th ST over Lrd W Douglas Ave built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 1992.
What condition is Sth 181-N 76th ST over Lrd W Douglas Ave in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Sth 181-N 76th ST over Lrd W Douglas Ave carry?
About 29,400 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is Sth 181-N 76th ST over Lrd W Douglas Ave?
The structure is 327 ft (99.8 m) long with a longest span of 65 ft (19.8 m) and a deck 86 ft wide.
Who owns Sth 181-N 76th ST over Lrd W Douglas Ave?
It is owned by the State Highway Agency.