Lrd W Locust ST over IH 43-N-S Freeway
FairMilwaukee County, Wisconsin · 0.6M E JCT Sth 57 · Structure no. B40020700000000
- Built
- 1964
- 61 years old, rebuilt 2023
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 198 ft
- 4 main spans
- Daily traffic
- 16,300
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Lrd W Locust ST over IH 43-N-S Freeway is a steel continuous stringer/multi-beam or girder carrying Lrd W Locust ST over IH 43-N-S Freeway in Milwaukee County, Wisconsin. It was built in 1964 and reconstructed in 2023, so it is 61 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,300 vehicles a day, projected to reach 22,700 by 2043. The structure is 198 ft (60.4 m) long and 102 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd W Locust ST over IH 43-N-S Freeway built?
It was built in 1964, making it 61 years old in 2025. It was reconstructed in 2023.
What condition is Lrd W Locust ST over IH 43-N-S Freeway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Lrd W Locust ST over IH 43-N-S Freeway carry?
About 16,300 vehicles per day (2022 count).
How long is Lrd W Locust ST over IH 43-N-S Freeway?
The structure is 198 ft (60.4 m) long with a longest span of 64 ft (19.4 m) and a deck 102 ft wide.
Who owns Lrd W Locust ST over IH 43-N-S Freeway?
It is owned by the State Highway Agency.