IH 94 Wb-E-W Freew over Lrd S 64th ST
FairMilwaukee County, Wisconsin · 1.1 MI W JCT Sth 175 · Structure no. B40008300000000
- Built
- 1960
- 65 years old, rebuilt 1973
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 137 ft
- 3 main spans
- Daily traffic
- 79,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
IH 94 Wb-E-W Freew over Lrd S 64th ST is a prestressed concrete continuous stringer/multi-beam or girder carrying IH 94 Wb-E-W Freew over Lrd S 64th ST in Milwaukee County, Wisconsin. It was built in 1960 and reconstructed in 1973, so it is 65 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 79,000 vehicles a day, roughly 1% of them trucks, projected to reach 94,800 by 2042. The structure is 137 ft (41.9 m) long and 62 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 94 Wb-E-W Freew over Lrd S 64th ST built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1973.
What condition is IH 94 Wb-E-W Freew over Lrd S 64th ST in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does IH 94 Wb-E-W Freew over Lrd S 64th ST carry?
About 79,000 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is IH 94 Wb-E-W Freew over Lrd S 64th ST?
The structure is 137 ft (41.9 m) long with a longest span of 64 ft (19.5 m) and a deck 62 ft wide.
Who owns IH 94 Wb-E-W Freew over Lrd S 64th ST?
It is owned by the State Highway Agency.