US Bridges

Lrd W Lloyd ST over Sth 175 - Stadium Freewa

Fair

Milwaukee County, Wisconsin · 1.7 MI E JCT Sth 181 · Structure no. B40006000000000

Built
1960
65 years old, rebuilt 1989
Condition
Fair
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
201 ft
4 main spans
Daily traffic
17,200
2022 count
Owner
State
State Highway Agency

About this bridge

Lrd W Lloyd ST over Sth 175 - Stadium Freewa is a prestressed concrete continuous stringer/multi-beam or girder carrying Lrd W Lloyd ST over Sth 175 - Stadium Freewa in Milwaukee County, Wisconsin. It was built in 1960 and reconstructed in 1989, so it is 65 years old, older than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 17,200 vehicles a day, projected to reach 17,200 by 2043. The structure is 201 ft (61.3 m) long and 82 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesLrd W Lloyd ST
CrossesSth 175 - Stadium Freewa
Location1.7 MI E JCT Sth 181
RouteCity Street 0
Coordinates43.05703, -87.9722
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.8 US tons
Inventory rating37.5 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length201 ft (61.3 m)
Longest span64 ft (19.6 m)
Deck width82 ft (25 m)
Roadway width68 ft (20.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic17,200 (2022)
Projected traffic17,200 by 2043
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.6 million (2024 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Lrd W Lloyd ST over Sth 175 - Stadium Freewa built?

It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1989.

What condition is Lrd W Lloyd ST over Sth 175 - Stadium Freewa in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.

How much traffic does Lrd W Lloyd ST over Sth 175 - Stadium Freewa carry?

About 17,200 vehicles per day (2022 count).

How long is Lrd W Lloyd ST over Sth 175 - Stadium Freewa?

The structure is 201 ft (61.3 m) long with a longest span of 64 ft (19.6 m) and a deck 82 ft wide.

Who owns Lrd W Lloyd ST over Sth 175 - Stadium Freewa?

It is owned by the State Highway Agency.