Lrd W Lloyd ST over Sth 175 - Stadium Freewa
FairMilwaukee County, Wisconsin · 1.7 MI E JCT Sth 181 · Structure no. B40006000000000
- Built
- 1960
- 65 years old, rebuilt 1989
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 201 ft
- 4 main spans
- Daily traffic
- 17,200
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Lrd W Lloyd ST over Sth 175 - Stadium Freewa is a prestressed concrete continuous stringer/multi-beam or girder carrying Lrd W Lloyd ST over Sth 175 - Stadium Freewa in Milwaukee County, Wisconsin. It was built in 1960 and reconstructed in 1989, so it is 65 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 17,200 vehicles a day, projected to reach 17,200 by 2043. The structure is 201 ft (61.3 m) long and 82 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd W Lloyd ST over Sth 175 - Stadium Freewa built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1989.
What condition is Lrd W Lloyd ST over Sth 175 - Stadium Freewa in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Lrd W Lloyd ST over Sth 175 - Stadium Freewa carry?
About 17,200 vehicles per day (2022 count).
How long is Lrd W Lloyd ST over Sth 175 - Stadium Freewa?
The structure is 201 ft (61.3 m) long with a longest span of 64 ft (19.6 m) and a deck 82 ft wide.
Who owns Lrd W Lloyd ST over Sth 175 - Stadium Freewa?
It is owned by the State Highway Agency.