IH 94-E-W Freeway over Lrd N 32nd ST
FairMilwaukee County, Wisconsin · 1.0M E JCT Ush 41 to S · Structure no. B40003300000000
- Built
- 1956
- 69 years old, rebuilt 1973
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 135 ft
- 3 main spans
- Daily traffic
- 168,000
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
IH 94-E-W Freeway over Lrd N 32nd ST is a steel stringer/multi-beam or girder carrying IH 94-E-W Freeway over Lrd N 32nd ST in Milwaukee County, Wisconsin. It was built in 1956 and reconstructed in 1973, so it is 69 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 168,000 vehicles a day, roughly 1% of them trucks, projected to reach 208,490 by 2042. The structure is 135 ft (41.1 m) long and 119 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 94-E-W Freeway over Lrd N 32nd ST built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1973.
What condition is IH 94-E-W Freeway over Lrd N 32nd ST in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does IH 94-E-W Freeway over Lrd N 32nd ST carry?
About 168,000 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is IH 94-E-W Freeway over Lrd N 32nd ST?
The structure is 135 ft (41.1 m) long with a longest span of 63 ft (19.3 m) and a deck 119 ft wide.
Who owns IH 94-E-W Freeway over Lrd N 32nd ST?
It is owned by the State Highway Agency.