IRR BIA RTE 9 over Keshena Power Canal
GoodMenominee County, Wisconsin · 2 KM North of Keshena · Structure no. 00000000000F919
- Built
- 1996
- 29 years old
- Condition
- Good
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 40 ft
- 1 main span
- Daily traffic
- 300
- 2024 count
- Owner
- Federal
- Bureau of Indian Affairs
About this bridge
IRR BIA RTE 9 over Keshena Power Canal is a wood or timber stringer/multi-beam or girder carrying IRR BIA RTE 9 over Keshena Power Canal in Menominee County, Wisconsin. It was built in 1996, so it is 29 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 300 vehicles a day, roughly 10% of them trucks, projected to reach 400 by 2044. The structure is 40 ft (12.2 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE 9 over Keshena Power Canal built?
It was built in 1996, making it 29 years old in 2025.
What condition is IRR BIA RTE 9 over Keshena Power Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.
How much traffic does IRR BIA RTE 9 over Keshena Power Canal carry?
About 300 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is IRR BIA RTE 9 over Keshena Power Canal?
The structure is 40 ft (12.2 m) long with a longest span of 40 ft (12.2 m) and a deck 38 ft wide.
Who owns IRR BIA RTE 9 over Keshena Power Canal?
It is owned by the Bureau of Indian Affairs.