Lrd Equity ST over Noisy Creek
GoodMarathon County, Wisconsin · 1.1M W JCT Sth 97 · Structure no. B37046200000000
- Built
- 2023
- 2 years old
- Condition
- Good
- inspected October 2023
- Type
- Slab
- Concrete
- Length
- 53 ft
- 1 main span
- Daily traffic
- 185
- 2023 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd Equity ST over Noisy Creek is a concrete slab carrying Lrd Equity ST over Noisy Creek in Marathon County, Wisconsin. It was built in 2023, so it is 2 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 185 vehicles a day, roughly 5% of them trucks, projected to reach 198 by 2043. The structure is 53 ft (16.1 m) long and 29 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Equity ST over Noisy Creek built?
It was built in 2023, making it 2 years old in 2025.
What condition is Lrd Equity ST over Noisy Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does Lrd Equity ST over Noisy Creek carry?
About 185 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Lrd Equity ST over Noisy Creek?
The structure is 53 ft (16.1 m) long with a longest span of 50 ft (15.2 m) and a deck 29 ft wide.
Who owns Lrd Equity ST over Noisy Creek?
It is owned by the Town or Township Highway Agency.