US Bridges

Lrd Pit RD over Big Sandy CR

Good

Marathon County, Wisconsin · 1.2 MI N JCT Sth 52 · Structure no. B37042700000000

Built
2013
12 years old
Condition
Good
inspected September 2024
Type
Slab
Concrete
Length
36 ft
1 main span
Daily traffic
84
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Pit RD over Big Sandy CR is a concrete slab carrying Lrd Pit RD over Big Sandy CR in Marathon County, Wisconsin. It was built in 2013, so it is 12 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 84 vehicles a day, roughly 10% of them trucks, projected to reach 82 by 2043. The structure is 36 ft (11.1 m) long and 27 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesLrd Pit RD
CrossesBig Sandy CR
Location1.2 MI N JCT Sth 52
RouteCity Street 0
Coordinates45.0462, -89.4071
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51 US tons
Inventory rating39.2 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length36 ft (11.1 m)
Longest span34 ft (10.4 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic84 (2024)
Projected traffic82 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Pit RD over Big Sandy CR built?

It was built in 2013, making it 12 years old in 2025.

What condition is Lrd Pit RD over Big Sandy CR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Lrd Pit RD over Big Sandy CR carry?

About 84 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Lrd Pit RD over Big Sandy CR?

The structure is 36 ft (11.1 m) long with a longest span of 34 ft (10.4 m) and a deck 27 ft wide.

Who owns Lrd Pit RD over Big Sandy CR?

It is owned by the Town or Township Highway Agency.