US Bridges

Lrd Hazelnut Road over Big Eau Pleine River

Good

Marathon County, Wisconsin · 0.9M S JCT Cth N · Structure no. B37041400000000

Built
2008
17 years old
Condition
Good
inspected August 2024
Type
Slab
Concrete
Length
157 ft
3 main spans
Daily traffic
50
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Hazelnut Road over Big Eau Pleine River is a concrete slab carrying Lrd Hazelnut Road over Big Eau Pleine River in Marathon County, Wisconsin. It was built in 2008, so it is 17 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 5% of them trucks, projected to reach 39 by 2043. The structure is 157 ft (47.8 m) long and 27 ft wide. If it were closed, the detour would be 5.6 mi (9 km).

CarriesLrd Hazelnut Road
CrossesBig Eau Pleine River
Location0.9M S JCT Cth N
RouteCity Street 0
Coordinates44.88883, -90.17997
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating49.6 US tons
Inventory rating38.3 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length157 ft (47.8 m)
Longest span62 ft (18.9 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2024)
Projected traffic39 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed5.6 mi (9 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Hazelnut Road over Big Eau Pleine River built?

It was built in 2008, making it 17 years old in 2025.

What condition is Lrd Hazelnut Road over Big Eau Pleine River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Lrd Hazelnut Road over Big Eau Pleine River carry?

About 50 vehicles per day (2024 count), of which roughly 5% are trucks.

How long is Lrd Hazelnut Road over Big Eau Pleine River?

The structure is 157 ft (47.8 m) long with a longest span of 62 ft (18.9 m) and a deck 27 ft wide.

Who owns Lrd Hazelnut Road over Big Eau Pleine River?

It is owned by the Town or Township Highway Agency.