US Bridges

Sth 29 WB over Lrd 28th Avenue

Good

Marathon County, Wisconsin · 0.2M Wof USH51N · Structure no. B37035600000000

Built
2008
17 years old
Condition
Good
inspected June 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
184 ft
2 main spans
Daily traffic
7,200
2022 count
Owner
State
State Highway Agency

About this bridge

Sth 29 WB over Lrd 28th Avenue is a prestressed concrete continuous stringer/multi-beam or girder carrying Sth 29 WB over Lrd 28th Avenue in Marathon County, Wisconsin. It was built in 2008, so it is 17 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,200 vehicles a day, roughly 5% of them trucks, projected to reach 8,640 by 2039. The structure is 184 ft (56.1 m) long and 43 ft wide. If it were closed, the detour would be 19.9 mi (32 km).

CarriesSth 29 WB
CrossesLrd 28th Avenue
Location0.2M Wof USH51N
RouteState Highway 29
Coordinates44.95397, -89.67053
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating53.6 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 25 or greater
Structure length184 ft (56.1 m)
Longest span90 ft (27.4 m)
Deck width43 ft (13.1 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,200 (2022)
Projected traffic8,640 by 2039
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed19.9 mi (32 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Sth 29 WB over Lrd 28th Avenue built?

It was built in 2008, making it 17 years old in 2025.

What condition is Sth 29 WB over Lrd 28th Avenue in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2022.

How much traffic does Sth 29 WB over Lrd 28th Avenue carry?

About 7,200 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Sth 29 WB over Lrd 28th Avenue?

The structure is 184 ft (56.1 m) long with a longest span of 90 ft (27.4 m) and a deck 43 ft wide.

Who owns Sth 29 WB over Lrd 28th Avenue?

It is owned by the State Highway Agency.