Lrd Parkway Lane over Francis Creek
FairManitowoc County, Wisconsin · 0.7M E JCT Cth R · Structure no. P36012500000000
- Built
- 1969
- 56 years old
- Condition
- Fair
- inspected November 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 54 ft
- 1 main span
- Daily traffic
- 210
- 2024 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd Parkway Lane over Francis Creek is a prestressed concrete box beam or girders - multiple carrying Lrd Parkway Lane over Francis Creek in Manitowoc County, Wisconsin. It was built in 1969, so it is 56 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 210 vehicles a day, projected to reach 225 by 2043. The structure is 54 ft (16.4 m) long and 33 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Parkway Lane over Francis Creek built?
It was built in 1969, making it 56 years old in 2025.
What condition is Lrd Parkway Lane over Francis Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does Lrd Parkway Lane over Francis Creek carry?
About 210 vehicles per day (2024 count).
How long is Lrd Parkway Lane over Francis Creek?
The structure is 54 ft (16.4 m) long with a longest span of 52 ft (15.8 m) and a deck 33 ft wide.
Who owns Lrd Parkway Lane over Francis Creek?
It is owned by the Town or Township Highway Agency.