Lrd Maple Lane over Whiteside Br Pecatonicar
GoodLafayette County, Wisconsin · Town of Belmont · Structure no. B33010300000000
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 42 ft
- 1 main span
- Daily traffic
- 250
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Lrd Maple Lane over Whiteside Br Pecatonicar is a prestressed concrete stringer/multi-beam or girder carrying Lrd Maple Lane over Whiteside Br Pecatonicar in Lafayette County, Wisconsin. It was built in 2002, so it is 23 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 250 vehicles a day, roughly 1% of them trucks, projected to reach 300 by 2043. The structure is 42 ft (12.8 m) long and 26 ft wide. If it were closed, the detour would be 2.5 mi (4 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Maple Lane over Whiteside Br Pecatonicar built?
It was built in 2002, making it 23 years old in 2025.
What condition is Lrd Maple Lane over Whiteside Br Pecatonicar in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does Lrd Maple Lane over Whiteside Br Pecatonicar carry?
About 250 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is Lrd Maple Lane over Whiteside Br Pecatonicar?
The structure is 42 ft (12.8 m) long with a longest span of 39 ft (12 m) and a deck 26 ft wide.
Who owns Lrd Maple Lane over Whiteside Br Pecatonicar?
It is owned by the State Highway Agency.