US Bridges

Cth S WB over Kilbourn Road Ditch

Good

Kenosha County, Wisconsin · At Kilbourn Road Ditch · Structure no. B30014900000000

Built
2020
5 years old
Condition
Good
inspected May 2024
Type
Slab
Concrete
Length
47 ft
1 main span
Daily traffic
9,355
2022 count
Owner
County
County Highway Agency

About this bridge

Cth S WB over Kilbourn Road Ditch is a concrete slab carrying Cth S WB over Kilbourn Road Ditch in Kenosha County, Wisconsin. It was built in 2020, so it is 5 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,355 vehicles a day, projected to reach 10,255 by 2043. The structure is 47 ft (14.4 m) long and 64 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCth S WB
CrossesKilbourn Road Ditch
LocationAt Kilbourn Road Ditch
RouteCounty Highway 0S
Coordinates42.6115, -87.94175
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.9 US tons
Inventory rating44.6 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length47 ft (14.4 m)
Longest span44 ft (13.4 m)
Deck width64 ft (19.4 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,355 (2022)
Projected traffic10,255 by 2043
Trucks0%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cth S WB over Kilbourn Road Ditch built?

It was built in 2020, making it 5 years old in 2025.

What condition is Cth S WB over Kilbourn Road Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Cth S WB over Kilbourn Road Ditch carry?

About 9,355 vehicles per day (2022 count).

How long is Cth S WB over Kilbourn Road Ditch?

The structure is 47 ft (14.4 m) long with a longest span of 44 ft (13.4 m) and a deck 64 ft wide.

Who owns Cth S WB over Kilbourn Road Ditch?

It is owned by the County Highway Agency.