Lrd Frankie RD over Br Stewarts Creek
FairPosted for loadJuneau County, Wisconsin · 0.4M S JCT Cth O · Structure no. P29091800000000
- Built
- 1930
- 95 years old
- Condition
- Fair
- inspected July 2024
- Type
- Slab
- Concrete
- Length
- 24 ft
- 1 main span
- Daily traffic
- 139
- 2022 count
- Owner
- Town / Township
- Town or Township Highway Agency
About this bridge
Lrd Frankie RD over Br Stewarts Creek is a concrete slab carrying Lrd Frankie RD over Br Stewarts Creek in Juneau County, Wisconsin. It was built in 1930, so it is 95 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 139 vehicles a day, projected to reach 152 by 2043. The structure is 24 ft (7.3 m) long and 22 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lrd Frankie RD over Br Stewarts Creek built?
It was built in 1930, making it 95 years old in 2025.
What condition is Lrd Frankie RD over Br Stewarts Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Lrd Frankie RD over Br Stewarts Creek carry?
About 139 vehicles per day (2022 count).
How long is Lrd Frankie RD over Br Stewarts Creek?
The structure is 24 ft (7.3 m) long with a longest span of 22 ft (6.8 m) and a deck 22 ft wide.
Who owns Lrd Frankie RD over Br Stewarts Creek?
It is owned by the Town or Township Highway Agency.