US Bridges

Lrd Cut Off RD over Branch Douglas Creek

Good

Jackson County, Wisconsin · .1M E JCT Sth 54 · Structure no. B27015900000000

Built
2015
10 years old
Condition
Good
inspected September 2024
Type
Slab
Concrete
Length
41 ft
1 main span
Daily traffic
35
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Cut Off RD over Branch Douglas Creek is a concrete slab carrying Lrd Cut Off RD over Branch Douglas Creek in Jackson County, Wisconsin. It was built in 2015, so it is 10 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 35 vehicles a day, projected to reach 50 by 2043. The structure is 41 ft (12.5 m) long and 27 ft wide. If it were closed, the detour would be 2.5 mi (4 km).

CarriesLrd Cut Off RD
CrossesBranch Douglas Creek
Location.1M E JCT Sth 54
RouteCity Street 0
Coordinates44.15078, -90.98754
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51 US tons
Inventory rating39.2 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length41 ft (12.5 m)
Longest span38 ft (11.6 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic35 (2022)
Projected traffic50 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed2.5 mi (4 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Cut Off RD over Branch Douglas Creek built?

It was built in 2015, making it 10 years old in 2025.

What condition is Lrd Cut Off RD over Branch Douglas Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Lrd Cut Off RD over Branch Douglas Creek carry?

About 35 vehicles per day (2022 count).

How long is Lrd Cut Off RD over Branch Douglas Creek?

The structure is 41 ft (12.5 m) long with a longest span of 38 ft (11.6 m) and a deck 27 ft wide.

Who owns Lrd Cut Off RD over Branch Douglas Creek?

It is owned by the Town or Township Highway Agency.