US Bridges

Ush 2 over Soo Line/Vaughn Creek

Good

Iron County, Wisconsin · 0.8M E JCT Sth 122 · Structure no. B26001100000000

Built
1976
49 years old, rebuilt 2018
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
168 ft
3 main spans
Daily traffic
4,300
2023 count
Owner
State
State Highway Agency

About this bridge

Ush 2 over Soo Line/Vaughn Creek is a prestressed concrete continuous stringer/multi-beam or girder carrying Ush 2 over Soo Line/Vaughn Creek in Iron County, Wisconsin. It was built in 1976 and reconstructed in 2018, so it is 49 years old, older than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,300 vehicles a day, roughly 9% of them trucks, projected to reach 6,840 by 2043. The structure is 168 ft (51.2 m) long and 47 ft wide. If it were closed, the detour would be 34.8 mi (56 km).

CarriesUsh 2
CrossesSoo Line/Vaughn Creek
Location0.8M E JCT Sth 122
RouteU.S. Route 2
Coordinates46.49899, -90.39687
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating82.8 US tons
Inventory rating42.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length168 ft (51.2 m)
Longest span55 ft (16.8 m)
Deck width47 ft (14.3 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,300 (2023)
Projected traffic6,840 by 2043
Trucks9%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesRailroad
Detour if closed34.8 mi (56 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Ush 2 over Soo Line/Vaughn Creek built?

It was built in 1976, making it 49 years old in 2025. It was reconstructed in 2018.

What condition is Ush 2 over Soo Line/Vaughn Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Ush 2 over Soo Line/Vaughn Creek carry?

About 4,300 vehicles per day (2023 count), of which roughly 9% are trucks.

How long is Ush 2 over Soo Line/Vaughn Creek?

The structure is 168 ft (51.2 m) long with a longest span of 55 ft (16.8 m) and a deck 47 ft wide.

Who owns Ush 2 over Soo Line/Vaughn Creek?

It is owned by the State Highway Agency.