US Bridges

Sth 39 over Mineral Point Branch

Fair

Iowa County, Wisconsin · 1.5M E JCT Cth E · Structure no. B25025000000000

Built
1936
89 years old
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
120 ft
3 main spans
Daily traffic
1,100
2022 count
Owner
State
State Highway Agency

About this bridge

Sth 39 over Mineral Point Branch is a steel stringer/multi-beam or girder carrying Sth 39 over Mineral Point Branch in Iowa County, Wisconsin. It was built in 1936, so it is 89 years old, older than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,100 vehicles a day, roughly 4% of them trucks, projected to reach 1,320 by 2042. The structure is 120 ft (36.7 m) long and 32 ft wide. If it were closed, the detour would be 11.8 mi (19 km).

CarriesSth 39
CrossesMineral Point Branch
Location1.5M E JCT Cth E
RouteState Highway 39
Coordinates42.86699, -90.20481
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.6 US tons
Inventory rating23.3 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadH 20
Structure length120 ft (36.7 m)
Longest span40 ft (12.3 m)
Deck width32 ft (9.9 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,100 (2022)
Projected traffic1,320 by 2042
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.8 mi (19 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sth 39 over Mineral Point Branch built?

It was built in 1936, making it 89 years old in 2025.

What condition is Sth 39 over Mineral Point Branch in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Sth 39 over Mineral Point Branch carry?

About 1,100 vehicles per day (2022 count), of which roughly 4% are trucks.

How long is Sth 39 over Mineral Point Branch?

The structure is 120 ft (36.7 m) long with a longest span of 40 ft (12.3 m) and a deck 32 ft wide.

Who owns Sth 39 over Mineral Point Branch?

It is owned by the State Highway Agency.