Sth 80 over Trib. to Morrey Creek
FairPosted for loadIowa County, Wisconsin · 3.5MI. N Cth P West · Structure no. B25017600000000
- Built
- 1930
- 95 years old
- Condition
- Fair
- inspected October 2023
- Type
- Tee Beam
- Concrete
- Length
- 22 ft
- 1 main span
- Daily traffic
- 320
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Sth 80 over Trib. to Morrey Creek is a concrete tee beam carrying Sth 80 over Trib. to Morrey Creek in Iowa County, Wisconsin. It was built in 1930, so it is 95 years old, older than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for other load-capacity restriction.
It carries about 320 vehicles a day, projected to reach 400 by 2042. The structure is 22 ft (6.7 m) long and 26 ft wide. If it were closed, the detour would be 5.6 mi (9 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 80 over Trib. to Morrey Creek built?
It was built in 1930, making it 95 years old in 2025.
What condition is Sth 80 over Trib. to Morrey Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Sth 80 over Trib. to Morrey Creek carry?
About 320 vehicles per day (2022 count).
How long is Sth 80 over Trib. to Morrey Creek?
The structure is 22 ft (6.7 m) long with a longest span of 21 ft (6.4 m) and a deck 26 ft wide.
Who owns Sth 80 over Trib. to Morrey Creek?
It is owned by the State Highway Agency.