US Bridges

Lrd Shanghai RD over Oakley Branch

Good

Green County, Wisconsin · 0.7M S JCT Cth K · Structure no. B23013900000000

Built
2003
22 years old
Condition
Good
inspected May 2024
Type
Culvert
Concrete Continuous
Length
22 ft
2 main spans
Daily traffic
105
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Shanghai RD over Oakley Branch is a concrete continuous culvert carrying Lrd Shanghai RD over Oakley Branch in Green County, Wisconsin. It was built in 2003, so it is 22 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 105 vehicles a day, roughly 10% of them trucks, projected to reach 115 by 2043. The structure is 22 ft (6.8 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLrd Shanghai RD
CrossesOakley Branch
Location0.7M S JCT Cth K
RouteCity Street 0
Coordinates42.51592, -89.47057
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.4 US tons
Inventory rating35.7 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length22 ft (6.8 m)
Longest span9 ft (2.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic105 (2022)
Projected traffic115 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Shanghai RD over Oakley Branch built?

It was built in 2003, making it 22 years old in 2025.

What condition is Lrd Shanghai RD over Oakley Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Lrd Shanghai RD over Oakley Branch carry?

About 105 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is Lrd Shanghai RD over Oakley Branch?

The structure is 22 ft (6.8 m) long with a longest span of 9 ft (2.7 m).

Who owns Lrd Shanghai RD over Oakley Branch?

It is owned by the Town or Township Highway Agency.