US Bridges

Lrd Freidig Road over Gill Creek

Good

Green County, Wisconsin · 1.3M E JCT Cth X · Structure no. B23011300000000

Built
1994
31 years old
Condition
Good
inspected May 2024
Type
Culvert
Concrete Continuous
Length
26 ft
2 main spans
Daily traffic
82
2022 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Freidig Road over Gill Creek is a concrete continuous culvert carrying Lrd Freidig Road over Gill Creek in Green County, Wisconsin. It was built in 1994, so it is 31 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 82 vehicles a day, roughly 10% of them trucks, projected to reach 90 by 2043. The structure is 26 ft (8 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLrd Freidig Road
CrossesGill Creek
Location1.3M E JCT Cth X
RouteCity Street 0
Coordinates42.81303, -89.46568
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating55.8 US tons
Inventory rating32.2 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length26 ft (8 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic82 (2022)
Projected traffic90 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$144,000 (2024 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Freidig Road over Gill Creek built?

It was built in 1994, making it 31 years old in 2025.

What condition is Lrd Freidig Road over Gill Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Lrd Freidig Road over Gill Creek carry?

About 82 vehicles per day (2022 count), of which roughly 10% are trucks.

How long is Lrd Freidig Road over Gill Creek?

The structure is 26 ft (8 m) long with a longest span of 10 ft (3 m).

Who owns Lrd Freidig Road over Gill Creek?

It is owned by the Town or Township Highway Agency.