Sth 59-MAIN ST over Sugar River
GoodGreen County, Wisconsin · 0.8M E JCT Cth F · Structure no. B23009600000000
- Built
- 1995
- 30 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 164 ft
- 2 main spans
- Daily traffic
- 3,800
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Sth 59-MAIN ST over Sugar River is a prestressed concrete continuous stringer/multi-beam or girder carrying Sth 59-MAIN ST over Sugar River in Green County, Wisconsin. It was built in 1995, so it is 30 years old, younger than the Wisconsin average of 40.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,800 vehicles a day, roughly 6% of them trucks, projected to reach 4,550 by 2043. The structure is 164 ft (49.9 m) long and 56 ft wide. If it were closed, the detour would be 5.6 mi (9 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sth 59-MAIN ST over Sugar River built?
It was built in 1995, making it 30 years old in 2025.
What condition is Sth 59-MAIN ST over Sugar River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Sth 59-MAIN ST over Sugar River carry?
About 3,800 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is Sth 59-MAIN ST over Sugar River?
The structure is 164 ft (49.9 m) long with a longest span of 87 ft (26.5 m) and a deck 56 ft wide.
Who owns Sth 59-MAIN ST over Sugar River?
It is owned by the State Highway Agency.