US Bridges

Lrd Southwest RD over Roundtree Branch

Good

Grant County, Wisconsin · 0.9M W JCT Sth 81 · Structure no. P22071500000000

Built
1966
59 years old
Condition
Good
inspected June 2023
Type
Culvert
Steel
Length
56 ft
3 main spans
Daily traffic
1,656
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lrd Southwest RD over Roundtree Branch is a steel culvert carrying Lrd Southwest RD over Roundtree Branch in Grant County, Wisconsin. It was built in 1966, so it is 59 years old, older than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,656 vehicles a day, projected to reach 1,821 by 2042. The structure is 56 ft (17.1 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLrd Southwest RD
CrossesRoundtree Branch
Location0.9M W JCT Sth 81
RouteCity Street 0
Coordinates42.72653, -90.494
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating59.4 US tons
Inventory rating26.8 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckCorrugated steel
Main spans3
Design loadH 15
Structure length56 ft (17.1 m)
Longest span14 ft (4.2 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,656 (2022)
Projected traffic1,821 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Southwest RD over Roundtree Branch built?

It was built in 1966, making it 59 years old in 2025.

What condition is Lrd Southwest RD over Roundtree Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Lrd Southwest RD over Roundtree Branch carry?

About 1,656 vehicles per day (2022 count).

How long is Lrd Southwest RD over Roundtree Branch?

The structure is 56 ft (17.1 m) long with a longest span of 14 ft (4.2 m).

Who owns Lrd Southwest RD over Roundtree Branch?

It is owned by the City or Municipal Highway Agency.