US Bridges

Lrd Woodland Lane over Menominee River

Good

Grant County, Wisconsin · 0.3 MI E JCT Ush 151 · Structure no. B22030100000000

Built
2023
2 years old
Condition
Good
inspected December 2023
Type
Slab
Concrete Continuous
Length
82 ft
2 main spans
Daily traffic
50
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Woodland Lane over Menominee River is a concrete continuous slab carrying Lrd Woodland Lane over Menominee River in Grant County, Wisconsin. It was built in 2023, so it is 2 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 50 by 2044. The structure is 82 ft (25.1 m) long and 27 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesLrd Woodland Lane
CrossesMenominee River
Location0.3 MI E JCT Ush 151
RouteCity Street 0
Coordinates42.53411, -90.60675
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating53.6 US tons
Inventory rating41.1 US tons

Structure

Structure typeSlab
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length82 ft (25.1 m)
Longest span40 ft (12.2 m)
Deck width27 ft (8.2 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2024)
Projected traffic50 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Woodland Lane over Menominee River built?

It was built in 2023, making it 2 years old in 2025.

What condition is Lrd Woodland Lane over Menominee River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.

How much traffic does Lrd Woodland Lane over Menominee River carry?

About 50 vehicles per day (2024 count).

How long is Lrd Woodland Lane over Menominee River?

The structure is 82 ft (25.1 m) long with a longest span of 40 ft (12.2 m) and a deck 27 ft wide.

Who owns Lrd Woodland Lane over Menominee River?

It is owned by the Town or Township Highway Agency.