US Bridges

Sth 35-STH 81 over Grant River

Good

Grant County, Wisconsin · 5.0M N JCT Cth N · Structure no. B22022600000000

Built
2009
16 years old
Condition
Good
inspected September 2021
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
324 ft
3 main spans
Daily traffic
1,500
2022 count
Owner
State
State Highway Agency

About this bridge

Sth 35-STH 81 over Grant River is a prestressed concrete continuous stringer/multi-beam or girder carrying Sth 35-STH 81 over Grant River in Grant County, Wisconsin. It was built in 2009, so it is 16 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,500 vehicles a day, projected to reach 2,050 by 2040. The structure is 324 ft (98.8 m) long and 38 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesSth 35-STH 81
CrossesGrant River
Location5.0M N JCT Cth N
RouteState Highway 35
Coordinates42.81467, -90.8339
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating93.6 US tons
Inventory rating50 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length324 ft (98.8 m)
Longest span120 ft (36.6 m)
Deck width38 ft (11.7 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2022)
Projected traffic2,050 by 2040
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sth 35-STH 81 over Grant River built?

It was built in 2009, making it 16 years old in 2025.

What condition is Sth 35-STH 81 over Grant River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2021.

How much traffic does Sth 35-STH 81 over Grant River carry?

About 1,500 vehicles per day (2022 count).

How long is Sth 35-STH 81 over Grant River?

The structure is 324 ft (98.8 m) long with a longest span of 120 ft (36.6 m) and a deck 38 ft wide.

Who owns Sth 35-STH 81 over Grant River?

It is owned by the State Highway Agency.