US Bridges

Sth 133 over Green River

Good

Grant County, Wisconsin · 0.6M N JCT Cth C · Structure no. B22021700000000

Built
2022
3 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
154 ft
1 main span
Daily traffic
530
2022 count
Owner
State
State Highway Agency

About this bridge

Sth 133 over Green River is a prestressed concrete stringer/multi-beam or girder carrying Sth 133 over Green River in Grant County, Wisconsin. It was built in 2022, so it is 3 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 530 vehicles a day, projected to reach 640 by 2042. The structure is 154 ft (46.9 m) long and 39 ft wide. If it were closed, the detour would be 37.9 mi (61 km).

CarriesSth 133
CrossesGreen River
Location0.6M N JCT Cth C
RouteState Highway 133
Coordinates43.06477, -90.83828
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating61.1 US tons
Inventory rating47.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length154 ft (46.9 m)
Longest span150 ft (45.7 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic530 (2022)
Projected traffic640 by 2042
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed37.9 mi (61 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sth 133 over Green River built?

It was built in 2022, making it 3 years old in 2025.

What condition is Sth 133 over Green River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Sth 133 over Green River carry?

About 530 vehicles per day (2022 count).

How long is Sth 133 over Green River?

The structure is 154 ft (46.9 m) long with a longest span of 150 ft (45.7 m) and a deck 39 ft wide.

Who owns Sth 133 over Green River?

It is owned by the State Highway Agency.