US Bridges

Sth 133 over Grant River

Good

Grant County, Wisconsin · 3.8M N JCT Cth U · Structure no. B22010800000000

Built
1997
28 years old
Condition
Good
inspected October 2021
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
224 ft
2 main spans
Daily traffic
810
2022 count
Owner
State
State Highway Agency

About this bridge

Sth 133 over Grant River is a prestressed concrete continuous stringer/multi-beam or girder carrying Sth 133 over Grant River in Grant County, Wisconsin. It was built in 1997, so it is 28 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 810 vehicles a day, roughly 16% of them trucks, projected to reach 890 by 2040. The structure is 224 ft (68.2 m) long and 39 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesSth 133
CrossesGrant River
Location3.8M N JCT Cth U
RouteState Highway 133
Coordinates42.67717, -90.75722
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2021
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating84.5 US tons
Inventory rating42.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length224 ft (68.2 m)
Longest span110 ft (33.5 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic810 (2022)
Projected traffic890 by 2040
Trucks16%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sth 133 over Grant River built?

It was built in 1997, making it 28 years old in 2025.

What condition is Sth 133 over Grant River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2021.

How much traffic does Sth 133 over Grant River carry?

About 810 vehicles per day (2022 count), of which roughly 16% are trucks.

How long is Sth 133 over Grant River?

The structure is 224 ft (68.2 m) long with a longest span of 110 ft (33.5 m) and a deck 39 ft wide.

Who owns Sth 133 over Grant River?

It is owned by the State Highway Agency.