US Bridges

Lrd Fairview RD over North Br Oconto River

Fair

Forest County, Wisconsin · 0.3M N JCT Sth 32 · Structure no. B21001600000000

Built
1995
30 years old
Condition
Fair
inspected November 2024
Type
Slab
Concrete
Length
26 ft
1 main span
Daily traffic
110
2024 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Lrd Fairview RD over North Br Oconto River is a concrete slab carrying Lrd Fairview RD over North Br Oconto River in Forest County, Wisconsin. It was built in 1995, so it is 30 years old, younger than the Wisconsin average of 40.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 110 vehicles a day, roughly 10% of them trucks, projected to reach 111 by 2043. The structure is 26 ft (7.9 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesLrd Fairview RD
CrossesNorth Br Oconto River
Location0.3M N JCT Sth 32
RouteCity Street 0
Coordinates45.44089, -88.65506
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73.9 US tons
Inventory rating44.6 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length26 ft (7.9 m)
Longest span24 ft (7.3 m)
Deck width26 ft (7.9 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic110 (2024)
Projected traffic111 by 2043
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lrd Fairview RD over North Br Oconto River built?

It was built in 1995, making it 30 years old in 2025.

What condition is Lrd Fairview RD over North Br Oconto River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.

How much traffic does Lrd Fairview RD over North Br Oconto River carry?

About 110 vehicles per day (2024 count), of which roughly 10% are trucks.

How long is Lrd Fairview RD over North Br Oconto River?

The structure is 26 ft (7.9 m) long with a longest span of 24 ft (7.3 m) and a deck 26 ft wide.

Who owns Lrd Fairview RD over North Br Oconto River?

It is owned by the Town or Township Highway Agency.